Construction & Engineering Awards 2022

Architecture Awards 2022 BUILD 5 creation of a realistic timeline of deliverables. This is made as simple as possible through the use of a Gantt chart. Two of the most recent projects the team were involved in saw them entrusted with the movement of manufacturing plants from one location to another. Logistically, this complex process saw the team working closely alongside various other service providers to ensure a smooth process. The first project was the movement of a full production line from California to Denver, with the MHMM team handling the electrical and mechanical installation in Colorado. The second customer project was much the same, seeing two plans moved into a new, single location, alongside the installation of a third line of new equipment. The team’s involvement in these projects was only possible thanks to their attitude of putting people first at all times. Throughout the process, MHMM kept a close eye on how the situation was developing and made sure that their clients were aware of precisely what was happening. As such, the MHMM team could adapt quickly to any changes that might have arisen, presenting themselves as honest, with an immense about of integrity and accountability.

RkJQdWJsaXNoZXIy MTUyMDQwMA==